Brudenell Road
RC Waterproof basement for a bespoke new individual property
-
Greggs Distribution Centre
Extension to the main distribution centre & offices with the provision of new lorry parking, dock leveller yard, lorry turning bay and additional on-site staff parking.
-
Polystar Plastics
GSJP were tasked with providing the bulk excavation & fill prior to and including the sub-structure RC concrete work, internal and external storm & foul drainage and the external hard paving works to provide parking and delivery space.
-
Coombe House
GSJP were engaged by Rollalong in November 2023 to aid with the Survey requirements and Design at Dorset Centre Of Excellence – Coombe House
-
The Goods Yard
Groundworks and RC frame construction to a new block of 33 apartments
-
Nairn Road, Poole
Foundations,oversite, retaining wall and drainage
-
RNLI, Poole
-
Priory Church of Lady St Mary, Wareham
-
The Nici Hotel, Bournemouth
Carried out groundworks and structural alterations to both the rear extension and the new spa facility. Installed an internal swimming pool. New carpark and hard landscaping throughout
-
Kingsbere Road, Weymouth
A development comprising six new houses in Weymouth. More details coming soon.
-
Swanage Hospital
GSJP started this project in November 2019 and complete in April 2020. These comprised of internal alterations, refurbishment, and extension of the Undercroft, laundry and stores, and gas meter and stores building, together with the construction of a new 21 space car park with associated drainage and external services.
-
Shore Road
GSJP started this project in December 2019 and complete in February 2020. These works comprised of drainage works, foundations and kerbing. This job was for Dorset County council modernising the promenade down at Sandbanks. Project was completed to time and budget.
-
Woodroffe School
GSJP are currently carrying this project for Stepnell. The works consist of drainage works, earthworks and 1000m3+ muck shift, extensive reinforced concretes work including waterproof concrete, retaining wall, and capping beam. This project is currently running to schedule.
-
Corhampton Road
GSJP started this project in March 2021 and completed in May 2021. The works comprised of drainage including pumping station for foul and stormwater, sewer connection for the new development, foundations, patios, and block paving for the external works package. This project ran to schedule and in budget.
-
Oakley Lane
GSJP started this project in April 2021 and set to complete in October 2021. This project has comprised of site strip, earthworks for foundations for 4 houses, installation if drainage and services, sewer connection, block paving and patios for each plot as well as a tarmac area for the entrance into the site. This project…
-
Chapel Lane
GSJP started this project in March 2021 and was ready for handover July 2021. This project comprised the external works package for two new dwellings. Works consisted of patios, fencing, drainage, trenching, foul connection, and block paved driveways.