-

Havant College, Hampshire
Havant & South Downs College Project: New Teaching Facility Block @ Havant College Project Description: GSJP returned to Havant College to complete the externals phase of the New Teaching Facility at Havant College. This involved shallow perimeter stormwater drainage, service installations, the commissioning of the foul pumping chamber, external hard paved tarmac surfacing, a permeable…
-

Andover College, Hampshire
New Training Facility, Andover College Project: New Steel frame training Facility & External parking Project Description: Having completed phase 1 of the works we returned to Andover to complete the external works phase of the project. This project provides an extension to the existing training facility at Andover College and additional parking for staff, pupils…
-

Christchurch Marina, Bournemouth
Project: 29 Residential park homes Project Description: GSJP took on this 29 unit residential park home estate in Christchurch, having been awarded by our client Regency Living, to cover all aspects of groundworks and finishings, including all infill requirements. From drainage to brickwork and even completion of turfing, has given our client a quality product…
-

Oakwood Court, Bordon
Project: 20 Residential park homes Project Description: GSJP took on this 20 unit residential park home estate in Bordon, having been awarded by our client Regency Living, to increase the size of there existing Park Home estate. All elements of groundworks have been covered within this project including, Demolition, Utilities, Drainage, Concrete bases and finishings.…
-

Former Buzz Bingo, Bournemouth
New Housing Development Central Bournemouth Project: 32 Houses & 8 Apartments with associated roads & parking Project Description: GSJP are pleased to announce our appointment by AJC Group to carry out the groundworks package for a new housing project in central Bournemouth on a complex brown field site post extensive demolition works. Construction: This includes…
-

Former Medical Centre, Hythe
Provide groundworks for the roads, sub-structures, drainage & external works to a select development of affordable housing at Hythe
-

Brudenell Road
RC Waterproof basement for a bespoke new individual property
-

Greggs Distribution Centre
Extension to the main distribution centre & offices with the provision of new lorry parking, dock leveller yard, lorry turning bay and additional on-site staff parking.
-

Polystar Plastics
GSJP were tasked with providing the bulk excavation & fill prior to and including the sub-structure RC concrete work, internal and external storm & foul drainage and the external hard paving works to provide parking and delivery space.
-

Coombe House
GSJP were engaged by Rollalong in November 2023 to aid with the Survey requirements and Design at Dorset Centre Of Excellence – Coombe House
-

The Goods Yard
Groundworks and RC frame construction to a new block of 33 apartments
-

Nairn Road, Poole
Foundations,oversite, retaining wall and drainage
-

RNLI, Poole
-

Priory Church of Lady St Mary, Wareham
-

The Nici Hotel, Bournemouth
Carried out groundworks and structural alterations to both the rear extension and the new spa facility. Installed an internal swimming pool. New carpark and hard landscaping throughout
-

Kingsbere Road, Weymouth
A development comprising six new houses in Weymouth. More details coming soon.
-

Swanage Hospital
GSJP started this project in November 2019 and complete in April 2020. These comprised of internal alterations, refurbishment, and extension of the Undercroft, laundry and stores, and gas meter and stores building, together with the construction of a new 21 space car park with associated drainage and external services.
-

Shore Road
GSJP started this project in December 2019 and complete in February 2020. These works comprised of drainage works, foundations and kerbing. This job was for Dorset County council modernising the promenade down at Sandbanks. Project was completed to time and budget.
-

Woodroffe School
GSJP are currently carrying this project for Stepnell. The works consist of drainage works, earthworks and 1000m3+ muck shift, extensive reinforced concretes work including waterproof concrete, retaining wall, and capping beam. This project is currently running to schedule.
-

Corhampton Road
GSJP started this project in March 2021 and completed in May 2021. The works comprised of drainage including pumping station for foul and stormwater, sewer connection for the new development, foundations, patios, and block paving for the external works package. This project ran to schedule and in budget.
-

Oakley Lane
GSJP started this project in April 2021 and set to complete in October 2021. This project has comprised of site strip, earthworks for foundations for 4 houses, installation if drainage and services, sewer connection, block paving and patios for each plot as well as a tarmac area for the entrance into the site. This project…
-

Chapel Lane
GSJP started this project in March 2021 and was ready for handover July 2021. This project comprised the external works package for two new dwellings. Works consisted of patios, fencing, drainage, trenching, foul connection, and block paved driveways.
